Roadmap
What's built, what's next
An honest tracker, not a marketing page. If it says shipped, it is live and doing its job. The rest is ordered by how close it is, not by how much I want it.
- shipped
- building
- planned
- vision
Foundation — live
The studio is built and running. These are load-bearing.
- Cipher Gothic / Kintsugi design systemOne hand-authored token set (global.css). Light mode wired site-wide via haven-ink.tokens.css. No Tailwind, no CDN fonts outside /artifacts/.(shipped)
- Constellation enginePure, unit-tested decay/layout/nodes math. Feeds the homepage hero, /constellation, /studio, /project/[slug], and /nodes-manifest.json from one node set.(shipped)
- Writing surfaces/writing catalogue by form, /blog reverse-chron, and the artifact / dispatch / field-note taxonomy behind the sub-listings.(shipped)
- Gay Wandering — Reader No. 01Shipped on Gumroad with byte-verified delivery; /gay-wandering carries the plates and the buy path.(shipped)
- Agent discoverability/.well-known MCP card, A2A agent card, Web Bot Auth JWKS, agent-skills; /auth.md; Accept: text/markdown content negotiation in middleware.(shipped)
- Contact + admin + feedsTurnstile + honeypot + timing + signed webhook on /api/contact. JWT-gated /admin, fail-closed. RSS + auto sitemap.(shipped)
- Store surfacestore.mazzeleczzare.com now reachable — /store landing plus Header and Footer links, and a one-time dismissable announcement card (enabled Sept 2026).(shipped)
- Constellation, fedSeven project nodes now span every zone: maestro fresh in experiment, decision-telemetry mid-drift, static-first at the erasure edge, four sealed in signal. The engine finally shows its whole vocabulary.(shipped)
In progress
Started, not finished. Each has a specific next move.
- svgo removeScripts findingA bypass class against svgo 4.1.0 confirmed during a dependency upgrade. Coordinated disclosure to the svg/svgo maintainers is in progress; mechanism stays private until it resolves.(building)
Planned
Known work, not yet started.
- Tesserae — first tilesThe collection is empty and the route renders a placeholder. It needs mosaic fragments written, not more code.(planned)
- Signal — past the first transmissionOne entry carries a full nav surface. Either grow the ledger or fold it into Studio.(planned)
- Re-theme /about, /work, /securityThe 2026-05 constellation spec left these three on the old grammar pending the token settle. Kintsugi has settled; they haven't moved.(planned)
- Prune the unused component shelfThree blog/* MDX components and the Cormorant SC faces are imported by zero posts. If the small-caps landing work doesn't land, they go together.(planned)
Vision — studio.mazzeleczzare.com as the workbench
Direction, not a schedule. The subdomain becomes a working dashboard provisioned with the custom toolchain, with room to grow and a real developer surface.
- Stratum ledger, surfaced liveThe append-only epistemic decision log, readable from the dashboard rather than only from disk.(vision)
- Stele — egregore compilationCompilation and generation of the stele egregore as a first-class panel.(vision)
- Adaptive response pluginWired into the workbench as an operable component.(vision)
- MCP gatewayA gateway surface so the workbench's tools are reachable by agents under one authenticated door.(vision)
- Growth + dev surfaceIts own repo, an architecture pass, and a Stratum-backed build journal so the thing can be developed autonomously without losing work.(vision)
Last updated 2026-09-09. This page is generated from a single list in its own source — roadmap.astro.